Asas do MS
Asas do MS (SSXA) serves Fátima do Sul, Brazil. This is a small airport with 1 runway (07/25). Field elevation is 1148 ft AMSL. Data on this page is maintained by the aviation community — contribute to keep it accurate.
Section Breakdown
See a next to a field? Click it to confirm the info is still correct. Recently verified Outdated — please verify
Basic Airport Information
- ICAO: SSXA
- Name: Asas do MS
- Type: small_airport
- Category: Private
- Latitude: -23.03861
- Longitude: -50.934444
- Elevation: 1148 ft
- Country: Brazil
- Municipality: Fátima do Sul
- IATA Code: N/A
- FAA Code: N/A
- FIR: SBCW
- Timezone: N/A
- Distance from City: N/A km
- VFR: Yes
- IFR: No
Runways
Runway 07/25
- Designation: 07/25
- Dimensions: 1969 X 59
- Surface: GRASS
- PCN: 5.000Kg/0.50MPa
- Lighting: N/A
- NAVAIDs: N/A
- Approach Types: N/A
- Remarks: N/A
Frequencies
- Tower: N/A
- Ground: N/A
- Operations: N/A
- Traffic/Approach: N/A
- ATIS: N/A
Operation Hours
- Open: N/A
- Close: N/A
- Extra Hours On Request: Yes
- Remarks: Airport STATUS= Active OPR TIME IN UTC -4 The AD's TFC circuit must be performed only by the NW SECTOR (Northwest Sector) of the mentioned aerodrome and, obligatorily, at 1100FT of HGT. COOR of simultaneous OPS should be done between the ACFT evolving in the TFC circuits of SSXA and SSXF, on the FREQ 123.450MHz.
Contacts
- AIS Tel: N/A
- ARO Tel: N/A
- MET Tel: N/A
- Admin Tel: N/A
- Health Tel: N/A
- Police Tel: N/A
- Authorities Tel: N/A
- Website: N/A
- Remarks: N/A
Slots / PPR
- Slot Required: No
- PPR Required: No
- PPR Contact: N/A
- Remarks: N/A
Immigration
- Port of Entry: No
- GENDEC Required: No
- GAR Required: No
- Remarks: N/A
Airport Services
No services listed for this airport yet.
Are you a service provider? Register here to appear in this airport's listing.
Brazil Permit Requirements
- Overflight Permit: No
- Landing Permit: Conditional
- Overflight Lead Time: Notification only (no advance time specified for overflight-only; 24 hours recommended)
- Landing Lead Time: 24 hours (AVANAC for multi-airport); Part 135 charter: allow 5+ business days
Private/GA flights need ANAC authorization and DECEA flight plan approval. Recommend 5 days lead time.
Nearby Airports
Airport History
Discover the key milestones and historical events that shaped Asas do MS. Our community-powered timeline traces this airport's journey from its origins to the present day.
Explore HistoryFrequently Asked Questions
- Does SSXA require landing permits?
- Yes, landing permits are required for Asas do MS (Brazil).