Bagabag Airport (RPUZ) — Philippines
Bagabag Airport (RPUZ) Philippines. This is a small airport with 1 runway (09/27). Field elevation is 820 ft AMSL. Data on this page is maintained by the aviation community — contribute to keep it accurate.
Section Breakdown
See a next to a field? Click it to confirm the info is still correct. Recently verified Outdated — please verify
Basic Airport Information
- ICAO: RPUZ
- Name: Bagabag Airport
- Type: small_airport
- Category: Domestic
- Latitude: 16.6192
- Longitude: 121.251999
- Elevation: 820 ft
- Country: Philippines
- Municipality: N/A
- IATA Code: N/A
- FAA Code: N/A
- FIR: N/A
- Timezone: Asia/Manila
- Distance from City: N/A km
- VFR: Yes
- IFR: No
Runways
Runway 09/27
- Designation: 09/27
- Dimensions: 1200x29m
- Surface: COP
- PCN: N/A
- Lighting: Not lighted
- NAVAIDs: N/A
- Approach Types: N/A
- Remarks: N/A
Frequencies
- Tower: N/A
- Ground: N/A
- Operations: 123.400 MHz
- Traffic/Approach: N/A
- ATIS: N/A
Operation Hours
- Extra Hours On Request: No
- Remarks: N/A
Contacts
- AIS Tel: N/A
- ARO Tel: N/A
- MET Tel: N/A
- Admin Tel: N/A
- Health Tel: N/A
- Police Tel: N/A
- Authorities Tel: N/A
- Website: N/A
- Remarks: N/A
Slots / PPR
- Slot Required: No
- PPR Required: No
- PPR Contact: N/A
- Remarks: N/A
Fees
- Landing Fee: Based on MTOW; CAAP regulated
- Parking Fee: CAAP regulated rates
- Handling Mandatory: Yes
- Currency: PHP
- Remarks: Laoag International Airport. Ilocos Norte, northern Luzon. Former international gateway.
Fuel Information
- Fuel Type: Jet A-1
- Price/L: N/A
- Last Updated: 2026-02-18
- Remarks: Limited fuel supply. Pre-coordinate for larger volumes.
Immigration
- Port of Entry: Yes
- GENDEC Required: Yes
- GAR Required: No
- Remarks: International port of entry. CIQ available but may need advance notification.
Restrictions
- Curfew Start: 00:00
- Curfew End: 00:00
- Noise Chapter Min: N/A
- Remarks: No curfew. 2,440m runway.
Airport Services
No services listed for this airport yet.
Are you a service provider? Register here to appear in this airport's listing.
Philippines Permit Requirements
- Overflight Permit: Yes
- Landing Permit: Yes
- Overflight Lead Time: 48 hours minimum prior to scheduled departure
- Landing Lead Time: 7 business days minimum recommended; 2-3 weeks for FAOC processing
Prior permission required. Private non-revenue flights also require landing permits. CAA will verify private non-revenue status if passengers are being picked up, as cabotage is strictly prohibited.
Active NOTAMs
Nearby Airports
Airport History
Discover the key milestones and historical events that shaped Bagabag Airport. Our community-powered timeline traces this airport's journey from its origins to the present day.
Explore HistoryFrequently Asked Questions
- What fuel is available at RPUZ?
- Bagabag Airport offers Jet A-1.
- Does RPUZ require landing permits?
- Yes, landing permits are required for Bagabag Airport (Philippines).
- Where is RPUZ located?
- Bagabag Airport (RPUZ) is located in Philippines.
- How long is the runway at RPUZ?
- The main runway at Bagabag Airport (09/27) measures 1200x29m.
- Is RPUZ a port of entry?
- Yes, Bagabag Airport is a port of entry where international flights can clear customs and immigration.