Bassel Al-Assad International Airport
Bassel Al-Assad International Airport (OSLK/LTK) serves Latakia, Syrian Arab Republic. This is a mid-sized airport with 1 runway (17/35). Field elevation is 157 ft AMSL. Data on this page is maintained by the aviation community — contribute to keep it accurate.
Section Breakdown
See a next to a field? Click it to confirm the info is still correct. Recently verified Outdated — please verify
Basic Airport Information
- ICAO: OSLK
- Name: Bassel Al-Assad International Airport
- Type: medium_airport
- Category: Uncategorized
- Latitude: 35.4011
- Longitude: 35.9487
- Elevation: 157 ft
- Country: Syrian Arab Republic
- Municipality: Latakia
- IATA Code: LTK
- FAA Code: N/A
- FIR: N/A
- Timezone: N/A
- Distance from City: N/A km
- VFR: Yes
- IFR: No
Runways
Runway 17/35
- Designation: 17/35
- Dimensions: 2797x45m
- Surface: ASP
- PCN: N/A
- Lighting: Lighted
- NAVAIDs: N/A
- Approach Types: N/A
- Remarks: N/A
Frequencies
- Tower: 118.100 MHz
- Ground: N/A
- Operations: N/A
- Traffic/Approach: 120.000 MHz
- ATIS: N/A
Operation Hours
- Open: N/A
- Close: N/A
- Extra Hours On Request: No
- Remarks: N/A
Contacts
- AIS Tel: N/A
- ARO Tel: N/A
- MET Tel: N/A
- Admin Tel: N/A
- Health Tel: N/A
- Police Tel: N/A
- Authorities Tel: N/A
- Website: N/A
- Remarks: N/A
Slots / PPR
- Slot Required: No
- PPR Required: No
- PPR Contact: N/A
- Remarks: N/A
Immigration
- Port of Entry: No
- GENDEC Required: No
- GAR Required: No
- Remarks: N/A
Airport Services
No services listed for this airport yet.
Are you a service provider? Register here to appear in this airport's listing.
Syrian Arab Republic Permit Requirements
- Overflight Permit: Yes
- Landing Permit: Yes
- Overflight Lead Time: Minimum 48 hours for overflight; recommend 5 working days
- Landing Lead Time: Minimum 72 hours; practical lead time 4-5 working days
Private flights require full permits with no exemptions. Local agent mandatory. Insurance covering Syria specifically required.
Nearby Airports
Airport History
Discover the key milestones and historical events that shaped Bassel Al-Assad International Airport. Our community-powered timeline traces this airport's journey from its origins to the present day.
Explore HistoryFrequently Asked Questions
- What is the tower frequency at OSLK?
- The tower frequency at Bassel Al-Assad International Airport is 118.1 MHz.
- Does OSLK require landing permits?
- Yes, landing permits are required for Bassel Al-Assad International Airport (Syrian Arab Republic).