Bruchsal Airfield (EDTC) — BRUCHSAL, Germany
Bruchsal Airfield (EDTC) serves BRUCHSAL, Germany. This is a small airport with 1 runway (11/29). Field elevation is 364 ft AMSL. Data on this page is maintained by the aviation community — contribute to keep it accurate.
Section Breakdown
See a next to a field? Click it to confirm the info is still correct. Recently verified Outdated — please verify
Basic Airport Information
- ICAO: EDTC
- Name: Bruchsal Airfield
- Type: small_airport
- Category: Domestic
- Latitude: 49.134838
- Longitude: 8.56412
- Elevation: 364 ft
- Country: Germany
- Municipality: BRUCHSAL
- IATA Code: N/A
- FAA Code: N/A
- FIR: N/A
- Timezone: Europe/Berlin
- Distance from City: N/A km
- VFR: Yes
- IFR: No
Runways
Runway 11/29
- Designation: 11/29
- Dimensions: 500 x 30 m
- Surface: turf
- PCN: N/A
- Lighting: Not lighted
- NAVAIDs: N/A
- Approach Types: N/A
- Remarks: N/A
Frequencies
- Tower: N/A
- Ground: N/A
- Operations: 128.950, 123.990 MHz
- Traffic/Approach: N/A
- ATIS: N/A
Operation Hours
- Extra Hours On Request: No
- Remarks: N/A
Contacts
- AIS Tel: +49 174 9493330
- ARO Tel: N/A
- MET Tel: N/A
- Admin Tel: +49 176 5775 6099
- Health Tel: N/A
- Police Tel: N/A
- Authorities Tel: N/A
- Website: N/A
- Remarks: N/A
Slots / PPR
- Slot Required: No
- PPR Required: Yes
- PPR Contact: N/A
- Remarks: PPR
Immigration
- Port of Entry: No
- GENDEC Required: No
- GAR Required: No
- Remarks: N/A
Airport Services
No services listed for this airport yet.
Are you a service provider? Register here to appear in this airport's listing.
Germany Permit Requirements
- Overflight Permit: No
- Landing Permit: Conditional
- Overflight Lead Time: N/A (no permit needed). EASA TCO not required for overflight-only operations.
- Landing Lead Time: 2 full working days (individual flights, Sat/Sun not counted). 4 weeks (chains of 4+ flights in a series). First-time applicants: allow additional time for documentation review.
Private flights generally exempt from permits. Airport PPR may apply.
Nearby Airports
Airport History
Discover the key milestones and historical events that shaped Bruchsal Airfield. Our community-powered timeline traces this airport's journey from its origins to the present day.
Explore HistoryFrequently Asked Questions
- Does EDTC require landing permits?
- Yes, landing permits are required for Bruchsal Airfield (Germany).
- Does EDTC require slots or PPR?
- PPR is required at Bruchsal Airfield.
- Where is EDTC located?
- Bruchsal Airfield (EDTC) is located in BRUCHSAL, Germany.
- How long is the runway at EDTC?
- The main runway at Bruchsal Airfield (11/29) measures 500 x 30 m.