Gruibingen-Nortel Airfield (EDSO) — Göppingen, Germany
Gruibingen-Nortel Airfield (EDSO) serves Göppingen, Germany. This is a small airport with 1 runway (07/25). Field elevation is 2318 ft AMSL. Data on this page is maintained by the aviation community — contribute to keep it accurate.
Section Breakdown
See a next to a field? Click it to confirm the info is still correct. Recently verified Outdated — please verify
Basic Airport Information
- ICAO: EDSO
- Name: Gruibingen-Nortel Airfield
- Type: small_airport
- Category: Domestic
- Latitude: 48.621201
- Longitude: 9.6557
- Elevation: 2318 ft
- Country: Germany
- Municipality: Göppingen
- IATA Code: N/A
- FAA Code: N/A
- FIR: N/A
- Timezone: Europe/Berlin
- Distance from City: N/A km
- VFR: Yes
- IFR: No
Runways
Runway 07/25
- Designation: 07/25
- Dimensions: 500x40m
- Surface: grass
- PCN: N/A
- Lighting: Not lighted
- NAVAIDs: N/A
- Approach Types: N/A
- Remarks: N/A
Frequencies
- Tower: N/A
- Ground: N/A
- Operations: 128.950, 128.740 MHz
- Traffic/Approach: N/A
- ATIS: N/A
Operation Hours
- Extra Hours On Request: No
- Remarks: N/A
Contacts
- AIS Tel: N/A
- ARO Tel: N/A
- MET Tel: N/A
- Admin Tel: +49 7164 5445
- Health Tel: N/A
- Police Tel: N/A
- Authorities Tel: N/A
- Website: [email protected]
- Remarks: N/A
Slots / PPR
- Slot Required: No
- PPR Required: Yes
- PPR Contact: N/A
- Remarks: PPR
Immigration
- Port of Entry: No
- GENDEC Required: No
- GAR Required: No
- Remarks: N/A
Airport Services
No services listed for this airport yet.
Are you a service provider? Register here to appear in this airport's listing.
Germany Permit Requirements
- Overflight Permit: No
- Landing Permit: Conditional
- Overflight Lead Time: N/A (no permit needed). EASA TCO not required for overflight-only operations.
- Landing Lead Time: 2 full working days (individual flights, Sat/Sun not counted). 4 weeks (chains of 4+ flights in a series). First-time applicants: allow additional time for documentation review.
Private flights generally exempt from permits. Airport PPR may apply.
Nearby Airports
Airport History
Discover the key milestones and historical events that shaped Gruibingen-Nortel Airfield. Our community-powered timeline traces this airport's journey from its origins to the present day.
Explore HistoryFrequently Asked Questions
- Does EDSO require landing permits?
- Yes, landing permits are required for Gruibingen-Nortel Airfield (Germany).
- Does EDSO require slots or PPR?
- PPR is required at Gruibingen-Nortel Airfield.
- Where is EDSO located?
- Gruibingen-Nortel Airfield (EDSO) is located in Göppingen, Germany.
- How long is the runway at EDSO?
- The main runway at Gruibingen-Nortel Airfield (07/25) measures 500x40m.